"How often should we pentest?" usually gets the answer "once a year," and for many products that is still the right minimum. It is not enough for a product that ships every week. The right frequency depends on how fast your product changes, how sensitive the data is and what your customers and auditors expect. This guide explains the common baselines, the events that should trigger an extra test and how to set a rhythm that matches your risk.
If you are new to the subject, read what penetration testing is first. If you are still weighing manual and automated options, the comparison in automated vs manual penetration testing helps decide how to schedule each one.
The Short Answer
For most organizations, run a full penetration test at least once a year. Run another test after significant changes, and before major launches or large customer security reviews. Teams that release every week need more than a yearly test to keep their findings current.
That baseline reflects what standards and customers commonly expect. It is a floor, not a ceiling. Your own risk should move the number up or down.
Why Yearly Is the Usual Baseline
A yearly test is the baseline for three reasons. It matches the rhythm of most compliance frameworks and customer questionnaires. It is affordable for most teams when a test is booked, scoped and delivered as a project. And it catches the bigger issues that accumulate over a year of product work.
The limitation is obvious: a yearly test is a snapshot of one moment. Anything that changes after the test is outside its evidence. For a product that changes slowly, that is an acceptable gap. For a product that changes weekly, the gap can be months of exposure.
Standards and Expectations
Different requirements set different expectations. A few common ones:
| Source | What it expects | Notes |
|---|---|---|
| PCI DSS | Penetration testing at least every twelve months and after significant changes | Applies to cardholder data environments |
| SOC 2 | No fixed frequency, but evidence that security testing is part of your risk process | Auditors judge the process and its results |
| ISO 27001 | No fixed frequency, but testing should follow your risk assessment | Scope and interval are set by your own controls |
| Enterprise customers | Often a recent test, commonly within the past year | Expectations vary by contract and sector |
| Israeli regulation and sector rules | Depends on the sector and on the data you hold | Check with counsel for your specific case |
Read the current version of any standard you are bound by, and ask your assessor what they expect for scope and method. Requirements change over time, and a summary like this one is only a starting point.
What Auditors and Customers Look For
Auditors rarely ask only "when was your last test?" They ask whether testing is part of how you manage risk. They look for a documented schedule, a reason the schedule fits your product, the scope of each test, the findings and the evidence that each finding was fixed and retested. A test that happened last spring, with no record of what changed since, is weaker evidence than a shorter, well-documented cycle.
Enterprise customers ask similar questions in security reviews, usually with more detail. They want the date of the latest test, whether it covered the product they use, whether critical findings were closed, and whether the next test is already planned. A clear answer to those four questions often closes a review faster than a long document.
The method matters too. A test should follow a recognized approach, such as the one described in NIST SP 800-115, and it should be run by a qualified tester or a tool that verifies its own findings. Ask your provider to describe the approach in writing, so you can show it to an assessor.
Events That Should Trigger a Test
Some changes create risk faster than a calendar does. Plan an extra test after:
- Authentication changes: a new login method, an SSO integration, a change to password reset or MFA.
- New roles or permissions: a new admin role, a partner role or a change in who can see what.
- Payments or billing changes: new plans, coupons, refunds or a new payment provider.
- New public API or major API version: every new endpoint is a new surface to attack.
- Major refactors: moving a framework, rewriting a core module or changing how data is stored.
- New infrastructure: a new cloud account, region, storage bucket or third-party integration.
- Security incidents: after an incident, test to confirm the weakness is closed and nothing related remains.
- Acquisitions or new products: inherited code and infrastructure often arrive untested.
A good habit is to add a line to your release checklist: does this change touch authentication, authorization, payments, data access or a public interface? If yes, the next test should cover it.
Frequency for Fast-Moving Products
Teams that ship every week face a different problem. A yearly test can be perfectly scoped and still describe software that was replaced months ago. The practical approach has three layers:
- Every release: an automated test that exploits findings on the changed areas and runs the regression checks for known issues. It should take hours, not weeks.
- Before major launches: a deeper test of the new features, with a human review of the riskiest areas.
- At least once a year: a broader test of the whole product and its roles, with a named reviewer for the report.
This layered model keeps the time between proof short without making every release wait for a booked engagement. The model is explained in more depth in continuous penetration testing.
How to Set Your Own Frequency
Frequency is a risk decision, so answer these questions honestly:
- How often does the product change? The faster the change, the shorter the gap should be.
- What data does it hold? Customer payment data, health data or personal information justify more testing.
- Who depends on it? A product your customers rely on for their own compliance needs a predictable schedule.
- What is the cost of a missed bug? A bug that exposes every customer's data is worth more testing than one that exposes a marketing page.
- Do you have a security owner? Without one, scheduled tests often slip. Put the next test date on the calendar before the current one ends.
A simple rule that many teams can follow: test the whole product once a year, test each significant change before it ships, and test continuously in between if the product changes often.
What to Do Between Tests
Between formal tests, keep your defenses honest with lighter work:
- Run a vulnerability scan on a regular schedule to catch outdated software and misconfigurations. Our article on penetration testing vs vulnerability scanning explains what scans do and do not find.
- Review access control whenever you add a role or an endpoint.
- Track the findings from the last test to confirm they stayed fixed.
- Keep test accounts and scope documentation up to date, so the next test starts quickly. The preparation checklist covers what to keep ready.
A Worked Example
Consider a B2B product with a web app, a public API and a team that releases twice a week. It serves customers in a regulated sector, and its largest customer asks for a recent test every year. A reasonable rhythm for that team looks like this:
- A full review each year, covering every role and the whole API, with a named reviewer for the report.
- Automated testing on each release, focused on changed endpoints and the known findings from earlier tests.
- A focused test before each large launch, such as a new billing model or an SSO integration.
- A short check after any incident, limited to the affected area and its neighbors.
Over a year, that rhythm produces a dozen or more points of evidence instead of one. When the customer asks in a review, the team can show the date and scope of each test, the findings that were fixed and the retest that confirmed the fix. The annual report still matters, but it is no longer the only proof.
Common Mistakes
Testing once for a certificate. A report is evidence about one version. Treat it as a snapshot and plan the next one.
Waiting for an audit. Testing only when a customer asks means the findings arrive late, when the next release is already in progress.
Testing without retesting. A test that finds issues but is never followed by a retest gives you a list, not a proof.
Using the same scope forever. New products, new roles and new APIs need to be added to the scope. An old scope tests an old product.
How Hetz Fits a Testing Rhythm
Hetz is built for the layered model. Each run is an agent-driven test of your live product: it signs in as your test users, exploits what it finds and keeps only proven issues, each with the exact request and response and a full fix. A one-click retest closes each finding after the change ships, so testing after every significant change is practical. The Continuous plan runs ongoing tests as you ship, and the Full Pentest and Elite plans cover deeper reviews before major launches or audits.
Next Steps
Write down your current frequency, then list the events from this article that happened in the last year and check whether each one had a test. Compare the plans on pricing, read how scope is enforced on security, and when you are ready to set the rhythm, start a scan.
FAQ